PROJECT LNG OF "LA PLATA". DOCK AND MARINE GAS PIPELINE. The project involves the execution of three main works: a breakwater and docks for the terminal, a gas pipeline and the opening dredging of the port of Punta Sayago (Uruguay). Dredging and the pipeline are direct investments. On the contrary the works of the [...]
CHANNELS AND COLLECTION OF RAINWATER IN PORT GENTIL. GABON.
Javier García FIgueroa2018-04-07T10:03:06+00:00RED DE CANALES Y RECOGIDA DE AGUAS PLUVIALES EN PORT GENTIL. GABON. ORFISA has done the measurement of the project, generating the budget. Total project cost: 50,780,246 744.12 f CFA HT Lineal Channels: 23.4 km Type of financing: loans Donor Name: French Development Agency Landlord party (signature phase): 26468053 014.97 f CFA HT Objective [...]
Riyadh Metro
Javier García FIgueroa2018-04-07T10:03:09+00:00Riyadh Metro The Metro Project comprises the following six (6) Lines Line 1 (Blue Line) runs in the North-South direction along Olaya and Batha streets, starting from slightly north of Prince Salman Bin Abdul Aziz Street and ending at Dar Al Badia neighbourhood in the south. The Metro will be mostly underground in [...]
Mersey Gateway Bridge
Javier García FIgueroa2018-04-07T10:03:10+00:00Mersey Gateway Bridge The main objectives of the project are to; relieve the congested Silver Jubilee Bridge, thereby removing the constraint on local and regional development and better provide for local transport needs, apply minimum toll and road user charges to both the Mersey Gateway Bridge and the SJB consistent with the [...]
WORKS PROGRAMME FOR “FEMERN TUNNELS PROJECT”
Javier García FIgueroa2018-04-07T10:03:11+00:00WORKS PROGRAMME FOR "FEMERN TUNNELS PROJECT" The fixed link will considerably reduce the travel time between Scandinavia and continental Europe: Whilst the current ferry transit takes 45 minutes (plus waiting time), train passengers will require only seven minutes, car drivers no more than ten. The duration of a train journey between Hamburg [...]
Riga International Airport
Javier García FIgueroa2018-04-07T10:03:12+00:00Riga Internation Airport The new Riga International Airport terminal project should be implemented before 2014. "The government has made it clear that it realizes the importance of the national air carrier" airBaltic ", which will be maintained. However, it is also necessary to implement the project of the airport terminal," said the minister. AUGULIS [...]
High-Speed Rail. California.
Javier García FIgueroa2018-04-07T10:01:12+00:00Construction Package 4: Delivering the High-Speed Rail Program Construction Package 4 (CP 4) is the third design-build construction contract for the high-speed rail program. The CP4 construction area is a 22-mile stretch within the counties of Tulare and Kern and the cities of Wasco and Shafter. It is bounded by a point approximately one mile [...]