Expansion of Revithoussa LNG Terminal Cryogenic Facilities
Description
Upgrade of a liquefied natural gas (LNG) terminal to increase gas reception, storage and output capacity. The project involves the construction of a third tank, upgrade of the marine facility, the installation of cryogenic equipment and an upgrade of metering.
Objetives
The project aims at debottlenecking storage and handling capacity at the existing LNG terminal.
Approximate amount
EUR 166 million
Environmental aspects
The project adds installations to an existing LNG terminal on the island of Revithoussa, which is fully dedicated to the terminal’s operation. Given its technical characteristics the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. The competent authority has obtained an EIA for the construction of the third tank from the Ministry of Environment, Energy and Climate Change (MEECC), and the two other EIAs are being elaborated.